This is topic Work methodology in forum Discussions About Orson Scott Card at Hatrack River Forum.


To visit this topic, use this URL:
http://www.hatrack.com/ubb/main/ultimatebb.php?ubb=get_topic;f=1;t=004826

Posted by Axi (Member # 10724) on :
 
Hi,

This is a question for Mr. Card. (mainly)

Thanks to this site, we know that Mr. Card often works at different projects at the same time: script of the film, stories for the internet galactic medicine show, one or two novels, articles for the rhino, etc. I was wondering how does he manage to do it (in a practical sense). I mean, does he spend a definite amount of time for each project each day, or maybe every day he chooses one of them to work in? And, how does he choose which one it will be?

I suppose I'm intrigued by his methodology.

(To those not being Mr. Card, any thought is welcomed) [Wink]
 


Copyright © 2008 Hatrack River Enterprises Inc. All rights reserved.
Reproduction in whole or in part without permission is prohibited.


Powered by Infopop Corporation
UBB.classic™ 6.7.2